参考文献/References:
[1] 胡康萍.人工湿地设计中的水力学问题研究[J].环境科学,1991,4(5):8-11.
Hu Kangping.Hydraulic research in the design of constructed wetland [J].Environmental Science,1991,4(5):8-11.(in Chinese)
[2] Sikora F J.Ammonium removal in constructed wetlands with recirculating subsurface flow:removal rates and mechanisms [J].Wat Sci & Tech,1995,32(3):193-202.
[3] Stober J T.Winter and spring evaluations of a wetlands of tertiary wastewater treatment [J]. Wat Environ Res,1997,69(5):961-968.
[4] Platzer Christoph.Design recommendations for subsurface flow constructed wetlands for nitrification and denitrification [J].Wat Sci & Tech,1999,40(3):257-263.
[5] 卢学强.污水湿地处理工程水力停留时间的测定[J].干旱环境监测,1999,13(2):74-75.
Lu Xueqiang.HRT measurement of wetland project for wastewater treatment[J].Arid Environmental Monitoring,1999,13(2):74-75.(in Chinese)
相似文献/References:
[1]刘慎坦,王国芳,谢祥峰,等.不同基质对人工湿地脱氮效果和硝化及反硝化细菌分布的影响[J].东南大学学报(自然科学版),2011,41(2):400.[doi:10.3969/j.issn.1001-0505.2011.02.035]
Liu Shentan,Wang Guofang,Xie Xiangfeng,et al.Effect of matrix on denitrification efficiency and distribution of nitrifying and denitrifying bacteria in constructed wetlands[J].Journal of Southeast University (Natural Science Edition),2011,41(3):400.[doi:10.3969/j.issn.1001-0505.2011.02.035]
[2]黄娟,杨思思,郭杨,等.强化供氧对低温域人工湿地脱氮及微环境的影响[J].东南大学学报(自然科学版),2013,43(5):1000.[doi:10.3969/j.issn.1001-0505.2013.05.017]
Huang Juan,Yang Sisi,Guo Yang,et al.Influence of aeration on nitrogen removal effect and microenvironment in constructed wetland at low temperature[J].Journal of Southeast University (Natural Science Edition),2013,43(3):1000.[doi:10.3969/j.issn.1001-0505.2013.05.017]