[1]王春苗,李兆霞,殷爱国.大型土木结构多目标一致逼近有限元模拟方法[J].东南大学学报(自然科学版),2009,39(1):78-84.[doi:10.3969/j.issn.1001-0505.2009.01.015]
 Wang Chunmiao,Li Zhaoxia,Yin Aiguo.Multi-objective concurrent approaching of simulating for civil infrastructure[J].Journal of Southeast University (Natural Science Edition),2009,39(1):78-84.[doi:10.3969/j.issn.1001-0505.2009.01.015]
点击复制

大型土木结构多目标一致逼近有限元模拟方法()
分享到:

《东南大学学报(自然科学版)》[ISSN:1001-0505/CN:32-1178/N]

卷:
39
期数:
2009年第1期
页码:
78-84
栏目:
土木工程
出版日期:
2009-01-20

文章信息/Info

Title:
Multi-objective concurrent approaching of simulating for civil infrastructure
作者:
王春苗1 李兆霞1 殷爱国2
1 东南大学土木工程学院, 南京 210096; 2 中铁七局集团有限公司科技部, 郑州 450007
Author(s):
Wang Chunmiao1 Li Zhaoxia1 Yin Aiguo2
1 School of Civil Engineering, Southeast University, Nanjing 210096, China
2 Chinese Railway No. 7 Engineering Group Co.Ltd., Zhengzhou 450007, China
关键词:
焊接结构 多目标一致逼近 结构模拟 模型修正
Keywords:
welded structure multi-objective concurrent approaching structure simulating model updating
分类号:
TU311
DOI:
10.3969/j.issn.1001-0505.2009.01.015
摘要:
阐述了大型土木结构多目标一致逼近模拟中的3个关键问题,即多目标一致逼近有限元模型的建立、单目标多因素同时修正技术及多目标多因素同时修正技术,并从多目标一致逼近模拟的特征和需求等方面来探讨多目标一致逼近模拟策略.重点阐述了多目标一致逼近模拟的建模过程,即如何建立多目标一致逼近有限元模型使之能够同时满足结构损伤分析和状态评估过程中的多目标模拟和结构行为一致多尺度模拟的需求.为考证多目标一致逼近模拟方法的可行性,以焊接钢桁架结构为研究对象,具体阐述了该结构包括一级模拟目标(动力特性)、二级模拟目标(整体名义应力)和三级模拟目标(局部热点应力及其分布规律)的多目标模拟过程.研究结果表明:钢桁架结构多目标一致逼近有限元模型的模拟结果均好于多目标模拟有限元模型,尤其是三级目标的模拟更加准确.
Abstract:
Three key issues of multi-objective concurrent approaching for simulating structural behavior of civil infrastructure have been analyzed,i.e., the modeling of multi-objective concurrent approaching of simulating, the optimization techniques for concurrent multi-factor as well as for concurrent multi-objective and multi-factor. Then, the modeling process of multi-objective concurrent approaching of simulating is described in detail, in which emphasis is paid on how the developed model could simultaneously satisfy the need of the multi-objective simulating during structural damage analysis and state assessment and the concurrent multi-scale modeling. Finally, the feasibility of the multi-objective concurrent approaching is validated through an example of the welded steel truss structure. The multi-objective simulating process is described including the first-level objective(the dynamical characteristic), the second-level objective(the nominal stresses in the whole structure), and the third-level objective(the local hot spot stresses and their distribution). It is shown from this work that the simulating results of the multi-objective concurrent approaching with the developed FEM(finite element model)of the welded steel truss are much better than those by multi-objective simulating, especially for the third-level objective.

参考文献/References:

[1] 李兆霞,孙正华,郭力,等.结构损伤一致多尺度模拟和分析方法[J].东南大学学报:自然科学版,2007,37(2):251-260.
  Li Zhaoxia,Sun Zhenghua,Guo Li,et al.Concurrent multi-scale modeling of structures and damage analyses[J]. Journal of Southeast University:Natural Science Edition,2007,37(2):251-260.(in Chinese)
[2] 孙正华.大跨钢桥梁考虑局部细节特性的结构多尺度模拟及其应用[D].南京:东南大学土木工程学院,2006.
[3] 吴佰建,李兆霞,汤可可.大型土木结构多尺度模拟与损伤分析——从材料多尺度力学到结构多尺度力学[J].力学进展,2007,37(3):321-335.
  Wu Baijian,Li Zhaoxia,Tang Keke.Multi-scale modeling and damage analyses of large civil structure—multi-scale mechanics from material to structure[J].Advances in Mechanics,2007,37(3):321-335.(in Chinese)
[4] Mottershead J E,Friswell M I.Model updating in structural dynamics:a survey [J]. Journal of Sound and Vibration,1993,167(2):347-375.
[5] 李辉,丁桦.结构动力模型修正方法研究进展[J].力学进展,2005,35(2):170-180.
  Li Hui,Ding Hua.Progress in model updating for structural dynamics[J]. Advances in Mechanics,2005,35(2):170-180.(in Chinese)
[6] 张启伟.基于环境振动测量值的悬索桥结构动力模型修正[J].振动工程学报,2002,15(1):74-78.
  Zhang Qiwei.Model updating of a suspension bridge using ambient vibration measurements[J].Journal of Vibration Engineering,2002,15(1):74-78.(in Chinese)
[7] Kim Gyeong-Ho,Park Youn-Sik.An improved updating parameter selection method and finite element model update using multiobjective optimisation technique[J]. Mechnical Systems and Signal Processing,2004,18(1):59-78.
[8] Andersen E Y,Pedersen L.Structural monitoring of the Great Belt East Bridge[C] //The Third Symposium on Strait Crossing.Rotterdam,Holand,1994:54-62.
[9] 李爱群,缪长青,李兆霞,等.润扬长江大桥结构健康监测系统研究[J].东南大学学报:自然科学版,2003,33(5):544-548.
  Li Aiqun,Miu Changqing,Li Zhaoxia,et al.Health monitoring system for the Runyang Yangtse River Bridge[J]. Journal of Southeast University:Natural Science Edition,2003,33(5):544-548.(in Chinese)
[10] 殷爱国.含局部焊接细节的桥梁钢桁架结构的静动力响应试验研究[D].南京:东南大学土木工程学院,2006.
[11] 王春苗,李兆霞,殷爱国.焊接结构响应的多目标模拟及模型修正敏感参数分析[J].工程抗震与加固改造,2007,29(5):39-48.
  Wang Chunmiao,Li Zhaoxia,Yin Aiguo.Multi-objective modeling of welded structures and analysis on sensitive model parameters[J]. Earthquake Resistant Engineering and Retrofitting,2007,29(5):39-48.(in Chinese)

备注/Memo

备注/Memo:
作者简介: 王春苗(1977—), 女, 博士生; 李兆霞(联系人),女, 博士, 教授, 博士生导师,zhxli@seu.edu.cn.
基金项目: 国家自然科学基金资助项目(10672038, 90715014).
引文格式: 王春苗,李兆霞,殷爱国.大型土木结构多目标一致逼近有限元模拟方法[J].东南大学学报:自然科学版,2009,39(1):78-84.
更新日期/Last Update: 2009-01-20