[1]邓小鹏,熊伟,袁竞峰,等.基于各方满意的PPP项目动态调价与补贴模型及实证研究[J].东南大学学报(自然科学版),2009,39(6):1252-1257.[doi:10.3969/j.issn.1001-0505.2009.06.032]
 Deng Xiaopeng,Xiong Wei,Yuan Jingfeng,et al.Dynamic pricing and subsidy model for PPP projects based on satisfaction of participants[J].Journal of Southeast University (Natural Science Edition),2009,39(6):1252-1257.[doi:10.3969/j.issn.1001-0505.2009.06.032]
点击复制

基于各方满意的PPP项目动态调价与补贴模型及实证研究()
分享到:

《东南大学学报(自然科学版)》[ISSN:1001-0505/CN:32-1178/N]

卷:
39
期数:
2009年第6期
页码:
1252-1257
栏目:
经济与管理
出版日期:
2009-11-20

文章信息/Info

Title:
Dynamic pricing and subsidy model for PPP projects based on satisfaction of participants
作者:
邓小鹏 熊伟 袁竞峰 李启明
东南大学建设与房地产研究所,南京 210096
Author(s):
Deng Xiaopeng Xiong Wei Yuan Jingfeng Li Qiming
Department of Construction Management and Real Estate, Southeast University, Nanjing 210096, China
关键词:
PPP 利益平衡 调价 补贴 系统动力学
Keywords:
public-private partnerships interests of balance price adjustment subsidies system dynamics
分类号:
F407.9
DOI:
10.3969/j.issn.1001-0505.2009.06.032
摘要:
为了解决PPP项目的运营期漫长,在运营期内项目各种因素的影响将会导致价格与补贴的调整问题,设计了一种动态的调价与补贴模型来应对各种可能的项目状况,以期达到参与方的利益平衡.以政府、私营企业、公众三方满意度均衡为目标,通过PPP项目的关键影响因素建构了指标体系,以指标对三方的影响权重为系数,运用系统动力学理论,建立了PPP项目的动态调价与补贴模型,得到了基于三方满意的PPP项目关键目标体系及其内生反馈机制.在此基础上设计出了调价和补贴模型的实施步骤,实证研究表明该调价模型的计算简单实用,具有良好的调节作用,符合初始的构想,即三方满意、动态调价.
Abstract:
There was a long-term operation period for PPP(public-private partnerships)projects. The changes of the projects inevitably resulted in the adjustments of prices and subsidies. The aim of this paper is to design a dynamic pricing and subsidy model to keep the interest balance in all changes of the project situation. Based on the balance of the tripartite(the public sector, the private sector and the general public)satisfaction mechanism, the objective system of PPP projects is structured by using the main objectives as indexes and the weights as modulus. Through system dynamics theory, the tripartite critical objectives system and the feedback mechanism of critical objectives are identified. Subsequently, the adjustment model is designed. A case study has been conducted to approve that the proposed method is practical and can be easily used. And the primary assumption that the balance of satisfaction of public sectors, private sectors and general public would be achieved by the proposed method is validated.

参考文献/References:

[1] 王灏.地铁公私合作模式运作中的票价政策研究[J].都市快轨交通,2004(5):12-15.
  Wang Hao.A study on the fare regulations in metro PPP practice[J].Urban Rapid Rail Transit,2004(5):12-15.(in Chinese)
[2] 陈爱国,卢有杰.基础设施PPP的价格调整及风险分析[J].建筑经济,2006(3):20-23.
  Cheng Aiguo,Lu Youjie.A study on infrastructure financing PPP model and its applications to small towns[J].Construction Economy,2006(3):20-23.(in Chinese)
[3] 赵立力,黄庆,谭德庆.基础设施BOT项目的产品价格调整机制研究[J].预测,2006(2):74-77.
  Zhao Lili,Huang Qing,Tan Deqing.Research on price adjustment mechanism for infrastructure BOT projects products[J].Forecasting,2006(2):74-77.(in Chinese)
[4] 杨卫华.基于风险分担的高速公路BOT项目特许定价研究[D].大连:大连理工大学土木工程学院,2007.
[5] 汪文雄.公私营合作(PPP)基础设施项目产品定价模型研究[D].南京:东南大学土木工程学院,2008.
[6] Ho S,Liang Y.An option pricing-based model for evaluating the financial viability of privatized infrastructure projects.[J].Construction Management and Economics,2002,20(2),143-156.
[7] 袁竞峰,李启明,邓小鹏,等.基于公共部门角度的PPP模式在我国发展的推动力研究[J].建筑经济,2009(1):26-30.
  Yuan Jingfeng,Li Qiming,Deng Xiaopeng,et al.Research on driving factors for the development of public private partnerships in China based on the perspective of public sectors[J].Construction Economy,2009(1):26-30.(in Chinese)
[8] 王其藩.系统动力学[M].北京:清华大学出版社,1988.
[9] Yuan J F,Zeng Y J,Skibniewski M J,et al.Selection of performance objectives and key performance indicators in public private partnership projects to achieve value for money[J].Construction Management and Economics,27(3):253-270.
[10] 广东省建设厅.广东省建筑工程质量评价指标体系[EB/OL].(2008-11-21)[2009-03-12].http://www.gdcic.net/second/Word/200506232101.doc.
[11] 陈滋顶.铁路客运服务满意度调查方法研究[J].铁道运输与经济,2006(8):52-54.
  Chen Zhiding.Railway passenger service satisfaction survey method[J].Railway Transport and Economy,2006(8):52-54.(in Chinese)
[12] 黄有亮.工程经济学[M].南京:东南大学出版社,2006.
[13] Shen L Y,Bao H J,Wu Y Z,et al.Using bargaining-game theory for negotiating concession period for BOT-type contract [J].Journal of Construction Engineering& Management,ASCE,2007,133(5),385-392.
[14] Chan A,Keoleian G,Gabler E.Evaluation of life-cycle cost analysis practices used by the Michigan Department of Transportation[J].Journal of Transportation Engineering,ASCE,2008,134(6):236-245.

备注/Memo

备注/Memo:
作者简介: 邓小鹏(1972—),男,博士,讲师,dengxp2002@sina.com.
基金项目: 建设部软科学研究资助项目(06-R3-22)/(07-R3-1).
引文格式: 邓小鹏,熊伟,等.基于各方满意的PPP项目动态调价与补贴模型及实证研究[J].东南大学学报:自然科学版,2009,39(6):1252-1257. [doi:10.3969/j.issn.1001-0505.2009.06.032]
更新日期/Last Update: 2009-11-20