[1]苏春,沙洋娟.基于混合不确定性和证据理论的再制造生产计划[J].东南大学学报(自然科学版),2010,40(4):712-716.[doi:10.3969/j.issn.1001-0505.2010.04.009]
 Su Chun,Sha Yangjuan.Remanufacturing production planning based on mixed-uncertainty and evidence theory[J].Journal of Southeast University (Natural Science Edition),2010,40(4):712-716.[doi:10.3969/j.issn.1001-0505.2010.04.009]
点击复制

基于混合不确定性和证据理论的再制造生产计划()
分享到:

《东南大学学报(自然科学版)》[ISSN:1001-0505/CN:32-1178/N]

卷:
40
期数:
2010年第4期
页码:
712-716
栏目:
经济与管理
出版日期:
2010-07-20

文章信息/Info

Title:
Remanufacturing production planning based on mixed-uncertainty and evidence theory
作者:
苏春 沙洋娟
东南大学机械工程学院, 南京 211189
Author(s):
Su Chun Sha Yangjuan
School of Mechanical Engineering,Southeast University,Nanjing 211189,China
关键词:
再制造 生产计划 混合不确定性 证据理论
Keywords:
remanufacturing production planning mixed uncertainty evidence theory
分类号:
F272.2
DOI:
10.3969/j.issn.1001-0505.2010.04.009
摘要:
提出了基于混合不确定性和证据理论的生产计划研究方法.首先在分析再制造工艺流程的基础上,考虑再制造过程中的随机参数和模糊参数,建立以利润最大化为目标的多周期混合不确定规划模型; 然后对不同截集水平下的模糊参数,采用随机仿真规划寻优,得到各个截集水平的最优解截集区间; 最后采用证据理论并结合仿真结果,获得优化目标值及其置信区间分布. 基于所提出的模型和算法完成再制造生产计划案例研究. 结果表明,该方法可以得到满意的再制造生产计划和利润最大化条件下的可再制造率区间.
Abstract:
A remanufacturing production planning method based on mixed-uncertainty and evidence theory is presented. Considering stochastic and fuzzy parameters in the process, a multi-period mixed-uncertainty programming model aiming at maximizing the profit is proposed based on the remanufacturing process flow analysis. By using stochastic simulation, the optimum cut set intervals in all cut set levels of fuzzy parameters can be acquired. The simulation results were integrated with the evidence theory, and the objective value and its distribution with confidence interval can be obtained. A case was studied based on the proposed model and algorithm. The results show that the method can provide satisfactory remanufacturing production planning and the optimal level of recovery rate based on optimal remanufacturing profit.

参考文献/References:

[1] Daniel V,Guide J R.Production planning and control for remanufacturing:industry practice and research needs [J].Journal of Operations Management,2000,18(4):467-483.
[2] Clegg A J,Williams D J,Uzsoy R.Production planning for companies with remanufacturing capability[C] //Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment.Orlando,FL,USA:IEEE Press,1995:186-191.
[3] Kim Kibum,Song Iksoo,Kim Juyong,et al.Supply planning model for remanufacturing system in reverse logistics environment[J]. Computers and Industrial Engineering,2006,51(2):279-287.
[4] Li Yongjian,Chen Jian,Cai Xiaoqiang.Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing [J]. International Journal of Production Economics,2007,105(2):301-317.
[5] Samar K,Huafan M.Joint procurement and production decisions in remanufacturing under quality and demand uncertainty [J].International Journal of Production Economics,2009,120(1):5-17.
[6] Robert P,Javad S,Ali G,et al.A production rate control policy for stochastic repair and remanufacturing systems [J].International Journal of Production Economics,2009,121(2):39-48.
[7] Arindam R,Kalipada M,Samarjit K,et al.A production—inventory model with remanufacturing for defective and usable items in fuzzy-environment [J]. Computers and Industrial Engineering,2009,56(1):87-96.
[8] 肖人彬,蔡政英.不确定质量水平下闭环质量链的成本模糊控制[J].计算机集成制造系统,2009,15(6):1207-1214.
  Xiao Renbin,Cai Zhengying.Fuzzy cost control of closed-loop quality chain under uncertain quality level[J].Computer Integrated Manufacturing Systems,2009,15(6):1207-1214.(in Chinese)
[9] 徐滨士,刘世参,史佩京,等.汽车发动机再制造效益分析及对循环经济的贡献[J].中国表面工程,2005(1):1-7.
  Xu Binshi,Liu Shican,Shi Peijing,et al.Study on the contribution of engine remanufacturing to the recycle economy[J].Chinese Surface Engineering,2005(1):1-7.(in Chinese)
[10] Ha-rok B,Ramana V,Robert A.An approximation approach for uncertainty quantification using evidence theory [J].Reliability Engineering and System Safety,2004,86(3):215-225.
[11] William L,Jon C,Cliff A,et al.Challenge problems:uncertainty in system response given uncertain parameters [J]. Reliability Engineering and System Safety,2004,85(1/2/3):11-19.
[12] Baudrit C,Guyonnet D,Dubois D.Postprocessing the hybrid method for addressing uncertainty in risk assessments [J]. Journal of Environmental Engineering,2005,131(12):1750-1754.

相似文献/References:

[1]蒋珉,王廷平,严洪森.含有限缓冲区的多生产线协调生产计划的研究[J].东南大学学报(自然科学版),2004,34(5):632.[doi:10.3969/j.issn.1001-0505.2004.05.016]
 Jiang Min,Wang Tingping,Yan Hongsen.Study of harmonious production planning for multiple production lines with limited buffers[J].Journal of Southeast University (Natural Science Edition),2004,34(4):632.[doi:10.3969/j.issn.1001-0505.2004.05.016]

备注/Memo

备注/Memo:
作者简介: 苏春(1970—),男,博士,副教授,博士生导师,suchun@seu.edu.cn.
基金项目: 国家自然科学基金资助项目(70671022).
引文格式: 苏春,沙洋娟.基于混合不确定性和证据理论的再制造生产计划[J].东南大学学报:自然科学版,2010,40(4):712-716. [doi:10.3969/j.issn.1001-0505.2010.04.009]
更新日期/Last Update: 2010-07-20