[1]高新南,刘松玉,童立元.苏州地铁车站基坑多支点咬合桩插入比分析[J].东南大学学报(自然科学版),2012,42(2):352-357.[doi:10.3969/j.issn.1001-0505.2012.02.030]
 Gao Xinnan,Liu Songyu,Tong Liyuan.Analysis of ratio of embedded depth of multi-pivot secant piles to excavation depth in Suzhou subway stations[J].Journal of Southeast University (Natural Science Edition),2012,42(2):352-357.[doi:10.3969/j.issn.1001-0505.2012.02.030]
点击复制

苏州地铁车站基坑多支点咬合桩插入比分析()
分享到:

《东南大学学报(自然科学版)》[ISSN:1001-0505/CN:32-1178/N]

卷:
42
期数:
2012年第2期
页码:
352-357
栏目:
土木工程
出版日期:
2012-03-20

文章信息/Info

Title:
Analysis of ratio of embedded depth of multi-pivot secant piles to excavation depth in Suzhou subway stations
作者:
高新南 刘松玉 童立元
东南大学交通学院,南京 210096
Author(s):
Gao Xinnan Liu Songyu Tong Liyuan
School of Transportation, Southeast University, Nanjing 210096, China
关键词:
地铁 多支点 咬合桩 插入比
Keywords:
subway multi-pivot secant pile ratio of embedded depth to excavation depth
分类号:
TU411.3
DOI:
10.3969/j.issn.1001-0505.2012.02.030
摘要:
以苏州地铁一号线南施街站咬合桩支护结构为例,运用深基坑支护结构分析软件,对插入比与基坑变形、支护结构内力的关系进行了分析.结果表明,咬合桩的最大侧移并非随插入比的增加而无限制地减小,当插入比达到一定值后,继续增加插入比几乎不能减小咬合桩的最大侧移; 插入比对最大坑外地表沉降、最大支撑轴力、咬合桩桩身最大弯矩和最大剪力的影响与此类似.因此,在满足抗渗流稳定性验算的条件下,苏州地铁车站基坑多支点咬合桩的插入比建议取为0.7~0.8,这样既能保证基坑的稳定和支护结构的安全,又能减少工程量,降低工程造价,且优化后的咬合桩支护结构仍具有较大的安全储备.该研究可为后续地铁线路及城市高层建筑的基坑设计提供借鉴.
Abstract:
Taking a foundation pit of Nanshijie station in Suzhou subway as an example, the relationship between the ratio of the embedded depth of the secant pile to the excavation depth and the deformation of the foundation pit and the internal forces of the retaining structure is analyzed to determine the suitable embedded depth by deep excavation design software. The results show that the maximum lateral displacement of the secant pile wall does not reduce monotonously with the increase in the ratio of the embedded depth to the excavation depth, and it is little affected by the increase in the ratio of the embedded depth to the excavation depth when the ratio reaches a certain value. The similar regularity can be found in the influence of the ratio of the embedded depth to the excavation depth on the maximum ground surface settlement, the maximum axial force of each support, the maximum bending moment and shear force of the secant pile wall. Therefore, it is considered to be optimum when the ratio of the embedded depth of the secant pile to the excavation depth in Suzhou subway stations is between 0.7 and 0.8 after checking computations of stability of resistance to penetrability. This reference range can not only guarantee the stability of the foundation pits and the security of the retaining structures, but also reduce the engineering quantity and the construction costs. And the suggested values still have large safety reserve. This study provides a reference for the design of the foundation pits of other subway lines and urban high-rise buildings.

参考文献/References:

[1] Poh T Y,Wong I H,Chandrasekaran B.Performance of two propped diaphragm walls in stiff residual soils [J].Journal of Performance of Constructed Facilities,1997,11(4):190-199.
[2] 高夕良.地下连续墙入土深度的分析[J].铁道工程学报,2008(4):28-31.
  Gao Xiliang.Analyses of the embedment depth of underground continuous wall [J].Journal of Railway Engineering Society,2008(4):28-31.(in Chinese)
[3] 杨将,彭加强,周奇辉,等.基于单因素分析的某深基坑优化设计[J].铁道工程学报,2009(3):84-88.
  Yang Jiang,Peng Jiaqiang,Zhou Qihui,et al.Analysis of optimal design for deep foundation pit with single-factor [J].Journal of Railway Engineering Society,2009(3):84-88.(in Chinese)
[4] 胡荣光,魏丽敏.入土深度和预加力对基坑支护结构变形及内力的影响[J].铁道建筑,2007(12):80-82.
  Hu Rongguang,Wei Limin.Influence of the embedded depth and prestressing force on the deformation and internal force of the retaining structure [J].Railway Engineering,2007(12):80-82.(in Chinese)
[5] 周裕倩,陈昌祺.钻孔咬合桩在上海地铁车站围护结构设计中的应用[J].地下工程与隧道,2006(3):36-38.
  Zhou Yuqian,Chen Changqi.Application of secant piles in the retaining structure of foundation pit for Shanghai metro [J].Underground Engineering and Tunnels,2006(3):36-38.(in Chinese)
[6] 陈斌,施斌,林梅.南京地铁软土地层咬合桩围护结构的技术研究[J].岩土工程学报,2005,27(3):354-357.
  Chen Bin,Shi Bin,Lin Mei.A study on the secant pile in soft soil for Nanjing metro project [J].Chinese Journal of Geotechnical Engineering,2005,27(3):354-357.(in Chinese)
[7] 靳利安,王朋.南京地铁新街口站围护结构钻孔咬合桩施工[J].山西建筑,2007,33(23):78-79.
  Jin Li’an,Wang Peng.Construction technology of drilling bitten pile in retaining structure construction of Xinjiekou station in Nanjing metro [J].Shanxi Architecture,2007,33(23):78-79.(in Chinese)
[8] 建设部标准定额研究所.JGJ 120—99 建筑基坑支护技术规程[S].北京:中国建筑工业出版社,1999.
[9] Broms B B,Wong I H,Wong K S.Experience with finite element analysis of braced excavation in Singapore [C] //Proceedings of the 2nd International Symposium on Numerical Models in Geomechanics.Ghent,Belgium,1986:309-324.
[10] Peck R B.Deep excavation and tunneling in soft ground [C] //Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering.Mexico City,Mexico,1969:225-281.
[11] 曾国熙,潘秋元,胡一峰.软黏土地基基坑开挖性状的研究[J].岩土工程学报,1988,10(3):13-22.
  Zeng Guoxi,Pan Qiuyuan,Hu Yifeng.The behavior of excavation in soft clay ground [J].Chinese Journal of Geotechnical Engineering,1988,10(3):13-22.(in Chinese)
[12] Hsieh P G,Ou C Y.Shape of ground surface settlement profiles caused by excavation [J].Canadian Geotechnical Journal,1998,35(6):1004-1017.

相似文献/References:

[1]张鹤年,阳建强,孙广俊,等.地铁运行诱发的环境振动数值模拟与模型预测[J].东南大学学报(自然科学版),2012,42(5):988.[doi:10.3969/j.issn.1001-0505.2012.05.034]
 Zhang Henian,Yang Jianqiang,Sun Guangjun,et al.Numerical simulation and model prediction for environmental vibrations induced by metro operation[J].Journal of Southeast University (Natural Science Edition),2012,42(2):988.[doi:10.3969/j.issn.1001-0505.2012.05.034]
[2]陆莹,李启明,周志鹏.基于模糊贝叶斯网络的地铁运营安全风险预测[J].东南大学学报(自然科学版),2010,40(5):1110.[doi:10.3969/j.issn.1001-0505.2010.05.043]
 Lu Ying,Li Qiming,Zhou Zhipeng.Safety risk prediction of subway operation based on fuzzy Bayesian network[J].Journal of Southeast University (Natural Science Edition),2010,40(2):1110.[doi:10.3969/j.issn.1001-0505.2010.05.043]

备注/Memo

备注/Memo:
作者简介: 高新南(1982—),女,博士生; 刘松玉(联系人),男,博士,教授,博士生导师,liusy@seu.edu.cn.
基金项目: 苏州市科技计划支撑资助项目(ZXJ0805).
引文格式: 高新南,刘松玉,童立元.苏州地铁车站基坑多支点咬合桩插入比分析[J].东南大学学报:自然科学版,2012,42(2):352-357. [doi:10.3969/j.issn.1001-0505.2012.02.030]
更新日期/Last Update: 2012-03-20