参考文献/References:
[1] 李国豪.桥梁结构稳定与振动[M].北京:中国铁道出版社,1992.
[2] 陈明宪.斜拉桥建造技术[M].北京:人民交通出版社,2003.
[3] 史家钧,金平.减振装置在桥梁工程中的应用[J].同济大学学报,2000,28(2):210-214.
Shi Jiajun,Jin Ping.Application of vibration reducer in bridge engineering[J].Journal of Tongji University,2000,28(2):210-214.(in Chinese)
[4] 张伟,岳澄,石九州.桥梁减振技术的发展与应用[J].青岛理工大学学报,2007,28(1):30-33.
Zhang Wei,Yue Cheng,Shi Jiuzhou.Development and application of bridge decreasing vibration technique[J].Journal of Qingdao Technological University,2007,28(1):30-33.(in Chinese)
[5] 成春玲.斜拉桥拉索减振方法和展望[J].交通世界,2008(4):155-156.
Cheng Chunling.Method and prospect of cable deceasing vibration[J].Transpo World,2008(4):155-156.(in Chinese)
[6] 马文刚,黄侨,陈晓强,等.基于两次等效索长的斜拉桥索力测量[J].公路交通科技,2011,28(9):66-70.
Ma Wengang,Huang Qiao,Chen Xiaoqiang,et al.Cable force measurement of cable-stayed bridge based on twice equivalent cable length[J].Journal of Highway and Transportation Research and Development,2011,28(9):66-70.(in Chinese)
[7] 贺修泽,付晓宁.斜拉索的索力测试[J].中外公路,2002,22(6):38-39.
He Xiuze,Fu Xiaoning.Test of cable tension in cable-stayed bridges[J].Journal of Foreign Highway,2002,22(6):38-39.(in Chinese)
[8] 雷凡.带减振器的斜拉桥索力测试方法的理论与试验研究[D].武汉:武汉理工大学交通学院,2007.
[9] 方志,张智勇.斜拉桥的索力测试[J].中国公路学报,1997,10(1):51-58.
Fang Zhi,Zhang Zhiyong.Test of cable tension in cable-stayed bridges[J].China Journal of Highway and Transport,1997,10(1):51-58.(in Chinese)
[10] 孙汝蛟,刘健新,胡兆同.高阻尼橡胶剪切型拉索减振器[J].长安大学学报:自然科学版,2005,25(1):37-40.
Sun Rujiao,Liu Jianxin,Hu Zhaotong.Shearing dampers on stay cables with high-damping rubber[J].Journal of Chang’an University:Natural Science Edition,2005,25(1):37-40.(in Chinese)
[11] Fang I-Kuang,Chen Chunray,Chang I-Shang.Field static load test on kao-ping-hsi cable-stayed bridge [J].Journal of Bridge Engineering,2004,9(6):531-540.