[1]朱悦,张玉林,宋旼珊.考虑手术间及医疗团队间准备时间的手术排程[J].东南大学学报(自然科学版),2015,45(6):1218-1222.[doi:10.3969/j.issn.1001-0505.2015.06.034]
 Zhu Yue,Zhang Yulin,Song Minshan.Surgical scheduling considering setup time between surgeries and setup time between surgical teams[J].Journal of Southeast University (Natural Science Edition),2015,45(6):1218-1222.[doi:10.3969/j.issn.1001-0505.2015.06.034]
点击复制

考虑手术间及医疗团队间准备时间的手术排程()
分享到:

《东南大学学报(自然科学版)》[ISSN:1001-0505/CN:32-1178/N]

卷:
45
期数:
2015年第6期
页码:
1218-1222
栏目:
经济与管理
出版日期:
2015-11-20

文章信息/Info

Title:
Surgical scheduling considering setup time between surgeries and setup time between surgical teams
作者:
朱悦张玉林宋旼珊
东南大学经济管理学院, 南京 211189
Author(s):
Zhu Yue Zhang Yulin Song Minshan
School of Economics and Management, Southeast University, Nanjing 211189, China
关键词:
医疗服务管理 调度 手术排程 学习效应 恶化效应
Keywords:
medical service management scheduling surgery scheduling learning effect deteriorating effect
分类号:
N945.25
DOI:
10.3969/j.issn.1001-0505.2015.06.034
摘要:
从医疗运营的角度出发,构建了包含手术间准备时间和医疗团队间准备时间的排程模型.该模型考虑了存在于手术时间和手术间准备时间的学习效应和存在于医疗团队间准备时间的恶化效应,以最小化所有手术完成时间为目标.研究表明,当每个医疗团队按照病人基本手术时间的非减顺序进行手术,按照给定多项式的非减顺序进入手术室时,完成所有病人手术的时间最短.最后通过数值算例来模拟现实手术的排程,验证了该排程模型能有效地缩短手术完成时间.
Abstract:
From the perspective of hospital operation, a surgical scheduling model including the setup time between consecutive surgeries and that between surgical teams was built up. The learning effect in both surgical duration and the setup time between consecutive surgeries as well as the deteriorating effect in the setup time between consecutive surgical teams was considered. The minimum of completion time of all the surgeries was set as the objective. The results show that the completion time is the shortest when each surgical team performs surgeries according to the non-decreasing order of normal surgical duration and all the surgical teams enter operating room according to the non-decreasing order of given multinomial. Finally, a set of numerical experiments are presented to simulate the process of surgical scheduling, proving that the proposed surgical scheduling model can shorten the surgical completion time effectively.

参考文献/References:

[1] 杜少甫,谢金贵,刘作仪.医疗运作管理:新兴研究热点及其进展[J].管理科学学报,2013,16(8):1-19.
  Du Shaofu, Xie Jingui, Liu Zuoyi. Progress and prospects in an emerging hot topic: healthcare operations management [J]. Journal of Management Sciences in China, 2013, 16(8): 1-19.(in Chinese)
[2] Austin T M, Lam H V, Shin N S, et al. Elective change of surgeon during the OR day has an operationally negligible impact on turnover time[J]. Journal of Clinical Anesthesia, 2014, 26(5): 343-349.
[3] Kodali B S, Kim D, Bleday R, et al. Successful strategies for the reduction of operating room turnover times in a tertiary care academic medical center [J]. Journal of Surgical Research, 2014, 187(2): 403-411.
[4] Arnaout J P M, Kulbashian S. Maximizing the utilization of operating rooms with stochastic times using simulation[C]//Proceedings of the 2008 Winter Simulation Conference. Miami, FL, USA, 2008: 1617-1623.
[5] Zhao Z X, Li X P. Scheduling elective surgeries with sequence-dependent setup times to multiple operating rooms using constraint programming [J]. Operations Research for Health Care, 2014, 3(3): 160-167.
[6] Ziaee S A M, Mohammadi S M, Kashi A H, et al. Evaluation of the learning curve for percutaneous nephrolithotomy[J]. Urology Journal, 2010, 7(4): 226-231.
[7] Bokhari M B, Patel C B, Ramos-Valadez D I, et al. Learning curve for robotic-assisted laparoscopic colorectal surgery [J]. Surgical Endoscopy, 2011, 25(3): 855-860.
[8] Stepaniak P S, Vrijland W W, de Quelerij M, et al. Working with a fixed operating room team on consecutive similar cases and the effect on case duration and turnover time[J]. Archives of Surgery, 2010, 145(12): 1165-1170.
[9] Wang J J, Liu Y J. Single-machine bicriterion group scheduling with deteriorating setup times and job processing times [J]. Applied Mathematics and Computation, 2014, 242: 309-314.
[10] Wang D, Huo Y Z, Ji P. Single-machine group scheduling with deteriorating jobs and allotted resource [J]. Optimization Letters, 2014, 8(2): 591-605.
[11] Lee W C, Wu C C. A note on single-machine group scheduling problems with position-based learning effect [J]. Applied Mathematical Modelling, 2009, 33(4): 2159-2163.
[12] Yang S J, Yang D L. Single-machine scheduling simultaneous with position-based and sum-of-processing-times-based learning considerations under group technology assumption [J]. Applied Mathematical Modelling, 2011, 35(5): 2068-2074.
[13] Kuo W H. Single-machine group scheduling with time-dependent learning effect and position-based setup time learning effect [J]. Annals of Operations Research, 2012, 196(1): 349-359.
[14] Luo L, Yao D D, Huang X, et al. Sequence-dependent anesthesia-controlled times: a retrospective study in an ophthalmology department of a single-site hospital [J]. Anesthesia & Analgesia, 2014, 119(1): 151-162.
[15] Graham R L, Lawler E L, Lenstra J K, et al. Optimization and approximation in deterministic sequencing and scheduling: a survey[J]. Annals of Discrete Mathematics, 1979, 5: 287-326.

相似文献/References:

[1]汪芸,谢俊清,沈卓炜,等.实时CORBA技术综述[J].东南大学学报(自然科学版),2002,32(3):311.[doi:10.3969/j.issn.1001-0505.2002.03.002]
 Wang Yun,Xie Junqing,Shen Zhuowei,et al.A survey of real-time CORBA[J].Journal of Southeast University (Natural Science Edition),2002,32(6):311.[doi:10.3969/j.issn.1001-0505.2002.03.002]
[2]金毅,达庆利,徐南荣,等.一类含模糊完成期的生产进度计划研究[J].东南大学学报(自然科学版),1994,24(6):124.[doi:10.3969/j.issn.1001-0505.1994.06.022]
 Jin Yi,Da Qingli,et al.Study of Production Schedule Program with Fuzzy Finishing Time[J].Journal of Southeast University (Natural Science Edition),1994,24(6):124.[doi:10.3969/j.issn.1001-0505.1994.06.022]
[3]吉联芳.考虑贷款的资金调度问题[J].东南大学学报(自然科学版),1993,23(5):122.[doi:10.3969/j.issn.1001-0505.1993.05.018]
 Ji Lianfang.On the Problem of Dispatching Capital Including Loan[J].Journal of Southeast University (Natural Science Edition),1993,23(6):122.[doi:10.3969/j.issn.1001-0505.1993.05.018]
[4]章宏甲.机床液压系统的逻辑设计——矩阵法[J].东南大学学报(自然科学版),1981,11(4):68.[doi:10.3969/j.issn.1001-0505.1981.04.008]
 Zhang Hong-jia.Logic Design of Machine-Tool Hydraulic Systems Using Matrix[J].Journal of Southeast University (Natural Science Edition),1981,11(6):68.[doi:10.3969/j.issn.1001-0505.1981.04.008]
[5]章宏甲.Veitch矩阵的性质和液压系统逻辑设计最佳方案[J].东南大学学报(自然科学版),1982,12(4):90.[doi:10.3969/j.issn.1001-0505.1982.04.009]
 Zhang Hong-jia.On Veitch Matrix and Optimization of Logic Scheme of Hydraulic Circuit[J].Journal of Southeast University (Natural Science Edition),1982,12(6):90.[doi:10.3969/j.issn.1001-0505.1982.04.009]

备注/Memo

备注/Memo:
收稿日期: 2015-04-05.
作者简介: 朱悦(1991—),男,硕士生;张玉林(联系人),男,博士,教授,博士生导师,zhangyl@seu.edu.cn.
基金项目: 国家自然科学基金资助项目(71171046).
引用本文: 朱悦,张玉林,宋旼珊.考虑手术间及医疗团队间准备时间的手术排程[J].东南大学学报:自然科学版,2015,45(6):1218-1222. [doi:10.3969/j.issn.1001-0505.2015.06.034]
更新日期/Last Update: 2015-11-20