[1]蒋珉,王廷平,严洪森.含有限缓冲区的多生产线协调生产计划的研究[J].东南大学学报(自然科学版),2004,34(5):632-637.[doi:10.3969/j.issn.1001-0505.2004.05.016]
 Jiang Min,Wang Tingping,Yan Hongsen.Study of harmonious production planning for multiple production lines with limited buffers[J].Journal of Southeast University (Natural Science Edition),2004,34(5):632-637.[doi:10.3969/j.issn.1001-0505.2004.05.016]
点击复制

含有限缓冲区的多生产线协调生产计划的研究()
分享到:

《东南大学学报(自然科学版)》[ISSN:1001-0505/CN:32-1178/N]

卷:
34
期数:
2004年第5期
页码:
632-637
栏目:
机械工程
出版日期:
2004-09-20

文章信息/Info

Title:
Study of harmonious production planning for multiple production lines with limited buffers
作者:
蒋珉 王廷平 严洪森
东南大学自动化研究所, 南京 210096
Author(s):
Jiang Min Wang Tingping Yan Hongsen
Research Institute of Automation, Southeast University, Nanjing 210096,China
关键词:
递阶 生产计划 缓冲区 同步 关联结构
Keywords:
hierarchical production planning buffer synchronize relational structure
分类号:
TB49
DOI:
10.3969/j.issn.1001-0505.2004.05.016
摘要:
研究了一类带有限缓冲区的多生产线协调生产计划的模型问题.通过对制造企业生产现场进行的调研,建立了上下游生产线成品关联结构,给出了成本最低的生产计划模型.该模型是非线性的且目标函数的梯度是分段常数,不能采用常规的非线性规划算法进行求解.考虑到该模型只有目标函数是非线性的,而约束是线性的,文中将非线性目标函数通过增加约束化为线性目标函数,从而把一个本来比较难以解决的非线性规划问题转化为线性规划问题,给实际应用带来了便利.仿真实例说明了依据该结构所建模型及算法的有效性.
Abstract:
A harmonious production planning model is presented. Based on investigation in manufacture-enterprise a relational structure of up-down stream parts is established, and a production planning model with lowest cost is given. Since the objective function of the model is nonlinear, the gradient of which is piecewise constant, the normal nonlinear programming algorithm can not be used. On account of the linearity of the constraints, the nonlinear objective function is converted to linear one by introducing proper constraints. Thus the difficult nonlinear programming problem can be transformed into a linear one which is more conveniment for practical use. Simulation results are given to illustrate the efficiency of the proposed model and algorithm.

参考文献/References:

[1] Yan H S.Hierarchical stochastic production planning for the highest business benefit [J]. Robotics and Computer-Integrated Manufacturing, 2001,17(5):405-419.
[2] Das B P,Rickard J G.An investigation on integration of aggregate production planning,through a common data model [J]. Computer & Chemical Engineering,2000,24(2-7):1625-1631.
[3] Yan H S,Jiang Z J.An interaction/prediction approach to solving problems of hierarchical production planning in flexible automation workshops [J]. International Journal of Computer Integrated Manufacturing, 1998,11(6):513-523.
[4] Sethi S P,Zhang Q,Zhou X Y.Hierarchical production controls in a stochastic two-machine flowshop with a finite internal buffer [J]. IEEE Transactions on Robotics and Automation, 1997,13(1):1-13.
[5] Koqan K,Lou S X C.Scheduling one-part-type serial manufacturing system under periodic demand:a solvable case [J]. Computers and Operations Research, 2002,29(9):1195-1206.
[6] Koqan K,Leu Y Y,Perkins J R.Parallel-machine,multiple-product-type,continuous-time scheduling:decomposable cases [J]. IIE Transactions(Institute of Industrial Engineers),2002,34(1):11-22.
[7] 徐智,席裕根,韩兵.基于递归算法的一类带缓冲区的混合生产调度[J].系统工程,2000,18(6):43-47.
  Xu Zhi,Xi Yugen,Han Bin.A hybrid production scheduling with buffer based on recursion [J]. Systems Enginerring, 2000,18(6):43-47.(in Chinese)
[8] Bryan N.Scheduling flowshops with finite buffers and sequence-dependent setup times [J].Computers and Industrial Engineering, 1999,36(1):163-177.
[9] Cleek G J,Johnson J A.In line with demand [J]. Manufacturing Systems, 1999,8:87-88.
[10] 严洪森.一种基于关联预测的车间生产计划的最优分解方法 [J].系统工程理论与实践,1997,17(12):58-63.
  Yan Hongsen.An optimal decomposition approach of workshop production planning based on interaction/prediction [J]. Theory and Practice of Systems Enginerring, 1997,17(12):58-63.(in Chinese)
[11] 丁广太,涂奉生.串行生产线的状态及输出与其缓冲区容量的关系分析[J].南开大学学报,1999,32(4):107-114.
  Ding Guangtai,Tu Fengsheng.Analysis of variance of output and state of a serial production line with different allocation of buffer capacities [J]. Journal of Nankai University, 1999,32(4):107-114.(in Chinese)
[12] 严洪森,张晓东,董昊.以正好满足产品需求为约束条件的车间最优生产计划[J].系统工程学报,2001,16(1):24-29.
  Yan Hongsen,Zhang Xiaodong,Dong Hao.Optimal production planning for workshops with demand constraints [J]. Journal of Systems Enginerring, 2001,16(1):24-29.(in Chinese)
[13] 朱宝琳,于海斌.基于协商的上下游供需合作计划模型的研究[J].计算机集成制造系统,2002,8(6):438-441.
  Zhu Baolin,Yu Haibin.Research on up-down stream collaboration planning model based on bargaining game [J]. Computer Integrated Manufacturing Systems, 2002,8(6):438-441.(in Chinese)
[14] Shang J,Li H.Integrated model for production planning in a large iron and steel manufacturing environment [J]. International Journal of Production Research, 2001,39(9):2037-2062.

相似文献/References:

[1]苏春,沙洋娟.基于混合不确定性和证据理论的再制造生产计划[J].东南大学学报(自然科学版),2010,40(4):712.[doi:10.3969/j.issn.1001-0505.2010.04.009]
 Su Chun,Sha Yangjuan.Remanufacturing production planning based on mixed-uncertainty and evidence theory[J].Journal of Southeast University (Natural Science Edition),2010,40(5):712.[doi:10.3969/j.issn.1001-0505.2010.04.009]

备注/Memo

备注/Memo:
作者简介: 蒋珉(1957—),男,副教授, jiangmin-57@tom.com.
更新日期/Last Update: 2004-09-20