[1]满洪高,李乔,张育智.斜拉桥索梁锚固结构疲劳试验模型设计优化[J].东南大学学报(自然科学版),2007,37(2):301-305.[doi:10.3969/j.issn.1001-0505.2007.02.023]
 Man Honggao,Li Qiao,Zhang Yuzhi.Design optimization of fatigue test model for the cable-girder anchorage zone of steel cable-stayed bridges[J].Journal of Southeast University (Natural Science Edition),2007,37(2):301-305.[doi:10.3969/j.issn.1001-0505.2007.02.023]
点击复制

斜拉桥索梁锚固结构疲劳试验模型设计优化()
分享到:

《东南大学学报(自然科学版)》[ISSN:1001-0505/CN:32-1178/N]

卷:
37
期数:
2007年第2期
页码:
301-305
栏目:
交通运输工程
出版日期:
2007-03-20

文章信息/Info

Title:
Design optimization of fatigue test model for the cable-girder anchorage zone of steel cable-stayed bridges
作者:
满洪高 李乔 张育智
西南交通大学土木工程学院, 成都 610031
Author(s):
Man Honggao Li Qiao Zhang Yuzhi
School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
关键词:
斜拉桥 索梁锚固结构 疲劳试验 模型设计 热点应力 优化
Keywords:
cable-stayed bridge cable-girder anchorage fatigue test model design hot spot stress optimization
分类号:
U441.2
DOI:
10.3969/j.issn.1001-0505.2007.02.023
摘要:
为了避免出现斜拉桥索梁锚固结构疲劳试验中辅助部分首先断裂的问题,在以往试验模型设计的基础上,考虑影响疲劳寿命的不同因素,建立了以模型的静力强度、位移、疲劳和断裂性能为模糊约束条件,以模型质量、疲劳和断裂寿命为多个目标的结构多目标优化设计模型.结合苏州-南通长江公路大桥钢锚箱式索梁锚固结构足尺疲劳试验,验证了锚箱式索梁锚固结构设计的正确性,经过400万次加载而未破坏,且减少了模型用钢量.模型设计中提出的控制热点应力等措施切实可行.
Abstract:
To avoid the first break of the accessorial structure in fatigue model test for the cable-girder anchorage zone of steel cable-stayed bridges, based on a few former fatigue test designs, a multi-objective optimum structural model which takes into account various factors affecting the fatigue life is established. This model design takes the static strength, displacement, fatigue and fracture performance as its fuzzy constraint conditions. The structural weight, fatigue and fracture lives are taken as the objectives of this design. A full scale static and fatigue model test of the cable-girder anchorage zone of Suzhou-Nantong Yangtze River Bridge was carried out. The results of model test verify the correctness of its design. The fatigue model of the anchorage system is not destroyed under 4 millions cyclic loads, and the amount of steel used for the model test is reduced. The methods such as hot spot stresses control in this model design are practical.

参考文献/References:

[1] 满洪高,李乔,唐亮.钢斜拉桥锚箱式索梁锚固区合理构造型式研究[J].中国铁道科学,2005,26(4):23-27.
  Man Honggao,Li Qiao,Tang Liang.Preliminary study on the reasonable pattern of cable girder anchorage for steel cable-stayed bridges[J]. China Railway Science,2005,26(4):23-27.(in Chinese)
[2] 李乔,唐亮,裴岷山,等.大跨径公路钢斜拉桥索梁锚固区疲劳试验荷载研究[J].公路,2004,27(12):7-10.
  Li Qiao,Tang Liang,Pei Minshan,et al.Study on the fatigue test loads of cable girder anchorage zone of long span highway steel cable stayed bridges[J].Highway, 2004,27(12):7-10.(in Chinese)
[3] 胡毓达.实用多目标最优化[M].上海:上海科学技术出版社,1990:22-77.
[4] 英国标准协会.英国标准5400第1-4篇:钢桥、混凝土桥及结合桥[S].成都:西南交通大学出版社,1986.
[5] Hobbacher A.Recommendations for fatigue design of weld joints and components[R].Cambridge,UK,1996.
[6] 贾法勇,霍立兴,张玉凤,等.热点应力有限元分析的主要影响因素[J].焊接学报,2003,24(3):27-30.
  Jia Fayong,Huo Lixing,Zhang Yufeng,et al.Key influence factors in hot spot stress FEM analysis [J]. Transactions of the China Welding Institution, 2003,24(3):27-30.(in Chinese)
[7] 李乔,满洪高,唐亮,等.苏通长江大桥主桥锚箱式索梁锚固结构模型静载与疲劳试验报告[R].成都:西南交通大学土木工程学院,2004.
[8] 周太全.桥梁构件局部热点应力分析及其疲劳损伤累积过程模拟[D],南京:东南大学土木工程学院,2003.
[9] Yamada K,Agerskov H.Fatigue life prediction of welded joints using fracture mechanics[R].Lyngby:Technical University of Denmark,1990.

相似文献/References:

[1]李枝军,李爱群,缪长青,等.运营状态下南京长江二桥拉索索力测试与分析[J].东南大学学报(自然科学版),2007,37(6):1057.[doi:10.3969/j.issn.1001-0505.2007.06.023]
 Li Zhijun,Li Aiqun,Miao Changqing,et al.Measurement and analysis of cable tension in the second Nanjing Yangtze River Bridge under running condition[J].Journal of Southeast University (Natural Science Edition),2007,37(2):1057.[doi:10.3969/j.issn.1001-0505.2007.06.023]
[2]王斐峰,叶见曙,邓学钧.滨州黄河大桥主梁边箱模型试验[J].东南大学学报(自然科学版),2005,35(6):920.[doi:10.3969/j.issn.1001-0505.2005.06.020]
 Wang Feifeng,Ye Jianshu,Deng Xuejun.Experimental on side boxes model of Binzhou Yellow River Bridge[J].Journal of Southeast University (Natural Science Edition),2005,35(2):920.[doi:10.3969/j.issn.1001-0505.2005.06.020]
[3]丁幼亮,李爱群,韩晓林,等.润扬大桥斜拉桥结构安全评估的有限元建模与修正[J].东南大学学报(自然科学版),2006,36(1):92.[doi:10.3969/j.issn.1001-0505.2006.01.019]
 Ding Youliang,Li Aiqun,Han Xiaolin,et al.Finite element modeling and updating of safety evaluation for Runyang cable-stayed bridge[J].Journal of Southeast University (Natural Science Edition),2006,36(2):92.[doi:10.3969/j.issn.1001-0505.2006.01.019]
[4]汪昕,吕志涛.斜向索力下钢-混凝土组合索塔锚固区荷载传递与分配关系分析[J].东南大学学报(自然科学版),2006,36(4):585.[doi:10.3969/j.issn.1001-0505.2006.04.019]
 Wang Xin,Lü Zhitao.Analysis of load transferring and distribution in anchorage zone of steel-concrete composite pylon under inclined cable forces[J].Journal of Southeast University (Natural Science Edition),2006,36(2):585.[doi:10.3969/j.issn.1001-0505.2006.04.019]
[5]杨杰,李爱群,缪长青.大跨斜拉桥动力特性的主元特征提取[J].东南大学学报(自然科学版),2006,36(4):613.[doi:10.3969/j.issn.1001-0505.2006.04.025]
 Yang Jie,Li Aiqun,Miao Changqing.Principal component feature extraction of dynamic characters in long span cable-stayed bridge[J].Journal of Southeast University (Natural Science Edition),2006,36(2):613.[doi:10.3969/j.issn.1001-0505.2006.04.025]
[6]李爱群,丁幼亮,费庆国,等.润扬大桥斜拉桥模态频率识别的环境变异性[J].东南大学学报(自然科学版),2007,37(2):245.[doi:10.3969/j.issn.1001-0505.2007.02.013]
 Li Aiqun,Ding Youliang,Fei Qingguo,et al.Environmental variability in modal frequency identification of Runyang Cable-Stayed Bridge[J].Journal of Southeast University (Natural Science Edition),2007,37(2):245.[doi:10.3969/j.issn.1001-0505.2007.02.013]
[7]张恒平,猪股俊司,青木(彳散)彦.混凝土斜拉桥用悬臂法施工的徐变分析[J].东南大学学报(自然科学版),1988,18(1):105.[doi:10.3969/j.issn.1001-0505.1988.01.012]
 Zhang Hengping (Departement of Civil Engineering) Shunji Inomata Tetsuhiko Aoki (Aizhi Institute of Technology,Japan).Creep Analysis for Cable Stayed Concrete Bridge during Cantilever-Construction[J].Journal of Southeast University (Natural Science Edition),1988,18(2):105.[doi:10.3969/j.issn.1001-0505.1988.01.012]
[8]丁幼亮,李爱群,缪长青.面向结构安全评估的大跨斜拉桥基准有限元模型[J].东南大学学报(自然科学版),2007,37(2):261.[doi:10.3969/j.issn.1001-0505.2007.02.015]
 Ding Youliang,Li Aiqun,Miao Changqing.Structural-safety-evaluation-oriented baseline finite element model of long-span cable-stayed bridge[J].Journal of Southeast University (Natural Science Edition),2007,37(2):261.[doi:10.3969/j.issn.1001-0505.2007.02.015]
[9]李建慧,李爱群,缪长青,等.润扬大桥修正斜拉索力的基准有限元模型[J].东南大学学报(自然科学版),2007,37(2):266.[doi:10.3969/j.issn.1001-0505.2007.02.016]
 Li Jianhui,Li Aiqun,Miao Changqing,et al.Baseline FE model to revise cable forces in Runyang Cable-Stayed Bridge[J].Journal of Southeast University (Natural Science Edition),2007,37(2):266.[doi:10.3969/j.issn.1001-0505.2007.02.016]
[10]张翠红,吕令毅.大跨度斜拉桥在多点随机地震激励作用下的响应分析[J].东南大学学报(自然科学版),2004,34(2):249.[doi:10.3969/j.issn.1001-0505.2004.02.025]
 Zhang Cuihong,Lu Lingyi.Seismic response analysis of long-span cable-stayed bridge under multi-support random excitations[J].Journal of Southeast University (Natural Science Edition),2004,34(2):249.[doi:10.3969/j.issn.1001-0505.2004.02.025]

备注/Memo

备注/Memo:
作者简介: 满洪高(1969—), 男, 博士生, 教授; 李乔(联系人), 男, 博士, 教授, 博士生导师, civillq@swjtu. edu. cn.
更新日期/Last Update: 2007-03-20